Fri
25
Apr '08
The bathroom is all painted. 75% of the lumber is out of the attic. The list of remaining items before listing is:
- install corner moulding on new bathroom walls
- install baseboards on new bathroom walls
- mount towel hooks in the two nooks
- mount second towel bar for hand towels
- clear out the rest of the lumber and junk in the lower attic
- vacuum lower loft
- move bed from vertical to horizontal and dress up as bed (sans mattress)
- make chandelier for over the kitchen table
- mow the lawn
- remove pots from front sidewalk
- patch holes from where artwork was
- do a deep clean for the house.
Got back to the city with time to swing by Portlock for a present for Eric and Kate. Going to just be a quiet evening at home working on three design possibilities for 7RadLLC. That, and a little TV.
[223 on the church scale]
Sorry we missed you! Let us know next time and we will feed you.